Liability
and Safety Concerns?
Bluewater Power can
give you peace of mind…..
Rotting utility poles can present a serious liability
to your company. Decay is usually not easily identified
since 90% of utility pole failure is caused by interior
rotting at or just below ground level. As a regular
part of your preventative maintenance program Bluewater
Power will test for pole deterioration by boring a 1.5
mm to 3.0 mm diameter needle drill at a 45 degree angle
to a boring depth of approximately 38 mm using specialized
Resistograph® equipment.
Bluewater Power’s Pole Testing Services can also
identify less common internal rot or damage to the exposed
portion of the pole. We provide you with a complete
written report including graphical representation of
the internal cross-section of every pole tested. Our
pole testing staff are certified professional Journeymen
Linemen.
The needle drill resistance method of testing greatly
enhances the predictability of utility pole failure,
which will prevent the unnecessary exchange of poles
and save you time and money. Although utility pole testing
can only provide definite analysis information for the
specific testing area of the pole, our services will
improve the efficiency of your preventative maintenance
program.
|